Svetlana Demaretskaya

Saved 1/7/18 11:20 AM to useful tips

Cunning rack for garage Production of a rack which will save the place for placement of the car over a viewing hole.  See details »

 
Video subtitles:
  • 00:00: Hello everybody my subscribers channel wanted share with you one idea is like make shelf Basically garage shelves Garage is already out repeatedly lot seen different but my It has a shelf certain nuances What is the reason it due to the fact that length of citizens It allows you to fully drive car repair ie I want to like make shelf various trinkets parts this tool to
  • 00:30: it was not chaotic more or less normal folded but on the other hand car I must be fully enter the garage and it remains a place repair so if I make the shelf rear of the garage it's just for is it me This place will steal 40 even centimeters It can be 45 I shelf width and 40 centimeters made Plus I have to insulate the back wall is now This will show you and
  • 01:01: the case of a car if you follow me to the end he accordingly closes the entrance basement for this purpose I I came up with some design can be nothing abstruse and no but you Now this thing I I show here so it looks sewn in the rear wall garage I insulate additionally inside Frame made from metal which created for plasterboard partitions
  • 01:33: Lodge on the foam for insulation nothing there not made any vapor barrier gidrobarer autom although it was originally I have this idea but I made on a simple stuffed foam and sewed respectively plates uesbi uesbi well plates himself I point out this is not moisture-proof and well
  • 02:00: respectively, will be some insulation thereby Wall purchased aesthetic appearance because she was there is sprinkled curve to plaster do not align not to engage some additional I took just nonsense and hid, and primer Ceresit Arskaya for to bond more or less remaining the rest plaster from the old she went to the host I, or rather, garage
  • 02:31: I went not with me very good repairs the entire mixture is made with some sand lime I do not know the solution so it is enough still strewed with the slightest dampness I have shelves procured such here welded frame and small sort at first glance it is clear that
  • 03:00: but now I Sketch and everything will all clear similar cases of scrap who was dragged away purchased somewhere something parents ghetto there posobirat all collected in the country say and will be painted have an aesthetic view Welding is done with using his apparatus this inverter that's pretty texas
  • 03:31: still good it turned out for household needs what but it should be given the I'm not a welder professional I think a fan sustain and terminates turn to drawings is here garage I have here It is an observation pit Well and, accordingly,
  • 04:00: this rear wall ceiling shelf I will be done follows me I showed you 4 welded frame they look at The principle is simple rectangle and boiled corners for shelves means one I set the frame here under the wall here so he will installed respectively shelves
  • 04:31: 2 frame will be here installed here under wall under the shelf will then one frame is It is set so Here one can be join make it clear also under the shelves well,
  • 05:02: respectively, where the like this here It will be another frame set to to car I went all the way to the wall was front space for free entrance in the viewing hole and basement respectively the car must be be exhausted rather must garage door lock to the rear wall so that's
  • 05:30: this space I I am doing this way of we can say Misha here means installed as a shelf It planned here so here that is obtained by the sides of the two tables and in the middle so as not to lose another top space I made a bracket on size it will be at us grab
  • 06:00: just three shelves this bracket and Now I have it on the table I was just I show around welding machine this bracket Drill the wall since I back void before laying all or rather after the frame carcass laying in level with the frame I made mortgages broke through I drilled a hole in the rear wall laid back reinforcement
  • 06:30: sixteenth welded and brewed Corner on a level with metal frame Now when I all sewn up I can drill holes already markings made tap a corner which Warren under the slabs uesbi and thus fasten bolts through will be such removable shelf or this bracket Bracket will we These support
  • 07:01: here blocks 1 to 2 and from above Itachi likewise will be even 3 regiment but here it is here the distance is It is an empty niche which will go free car so or this design I functionality will the rear wall and it is not will interfere car to prevent
  • 07:30: and normal arrival storage width I have a car swill meter meter or sixty meter I have not measured the seventy I remember exactly what there is this one interval meter Ninety reserve with two sides 10 centimeters in my there are at least will be enough regiment received 90 centimeters wide ninety-meter height that is, to it could be use
  • 08:00: and top shelf to ceiling total height 220 height each shelf turned 35 350 centimeters millimeters The only downside they came out on the shelves estimated 45 or 50 Why centimeters This is done to the very bottom can be stored or stacked overall some items such as some boxes there with tool will give
  • 08:30: We'll cleaner such as on the shelves 35 height centimeters possible will store small enough all sorts of details there or Domestic some things can still in more detail draw a blank leaf like only I got bracket installation right if it turns out sectional view room this is now
  • 09:00: rear wall which the garage was the frame figuratively turned includes but 5 to 7 10 centimeters took Depending on where gene flat wall therefore I went into the at least this frame metal from the garage I made calculations are correct I got it Bracket here is an example to distance will have to be
  • 09:31: a place for him I did install mortgages are here Across the pond, 16 welded pieces other parts of the garage this matter laid then from this side on the right way here will draw it will be a wall to It was clear but it will be frame on this side of the wall similarly Navariya
  • 10:00: two corner pieces for of the pin right-left is not and then ran piece welded corners when viewed in in front of the I got so Now welded Area it is near near one vertical stripes framework for plasterboard beating plate calculated before sewing respectively eg side Wall calculate all
  • 10:30: Now these distances height-to-ceiling then when the wall defense really was with I have calculated where is a mortgage now to I imagine it his arm drill openings threaded and bracket through uesbi plate esbe screwed closely presses all smooth and mouth are installed on your I think the place to design all it is clear now
  • 11:00: hold paint I think the work of the a week before the next weekends they will dry up all ready and will start assembly show you final result all colored dried already my arms in a week so now We begin to build beginning liberate space here everything was clean and We will begin to build design makes
  • 11:30: layout install side stretch the line and leveled so this way to clearly horizontally one of the shelves in any I get the floor garage has an uneven the nuances of how to left over from the previous owners but when I did suspended ceiling clearly repulsed by so the horizon I will be beat all of ceiling and vice versa if under the shelves there will be some clearance have to choose install
  • 12:00: some bars but it all to shelves were clearly horizontal after it is taut fishing line do alignment and install the suspension is just for medium-sized floor that is, as I have I told here I have a mortgage So I clearly said where it is I Drill a hole here in this suspended this bracket I impose drill hole through uesbi
  • 12:31: leaf and threaded thread is somewhere 3 the bolt 8 must I think that's enough and has clearly after apply the central shelf extremely can be establish such here intermediate props put on level and have I drilled a couple hole scoring dowel decided to plant their 6 anniversary
  • 13:00: Now it turns 12 here to the top and accurately as I drill the bottom all openings scoring I dowels navigate accurately as the second side secured she left rack get the most rather high floor in This is the place High pulled the fishing line so that the line show you here it is
  • 13:30: stretched and now I will measure the difference Now it turns 66 Now centimeters We go to the second We measure our side here we get Sixty-two with half centimeter that is actually three and a half centimeter drop so for this to all
  • 14:00: compensate I have a right Upright put a bar 3 centimeters thick at least there is plus or minus These 5 millimeters it no longer will be particularly affect using screwdriver at drilled board as I say I took a pen screws made of that and she has nowhere get to you somehow just board with three
  • 14:31: half centimeter 35 millimeters just That we you felt at the height to compensate for this height set I firmly stand right as I showed here perfectly clear should bar all on all on the floor level Verlaine pulled prize line and now on Now this fishing line that's it
  • 15:00: just tell me now the Here on this fishing line We will expose all the other rack Drill it pressuring Bracket sliced ​​like I poured M8 I draw shot down directly into Western which was provided one Bolt even now We expose on the level that was flat here
  • 15:32: so here and outline the It is to make two opening one here another here similarly cut into thread and stifle We clear on how the fishing line and presupposes Now all these shelves all then equals will set directly two intermediate support will make them width 90
  • 16:00: centimeters and they have we will stay directly on board using fixing the board ie their wall the idea of not fixing provided silently looming the entire structure so Here surrendered zasnimu that complete the look you here are just visible small refinement for some reason, I'm for it I forgot on one side Bracket made where board and lay on so the left side
  • 16:31: There was nothing so I had speak little corner and collect further we continue to collect Drills on a shelf one hole on each board one side and likewise on the other hand take paint over the board I end as I did here is here one number I gathered to everywhere she normally It was dyed and We start the whole thing
  • 17:00: bind and collect on the screws the whole thing It will look like this bottom contact, and that's see and shelves already adopted a rigid kind of already Nothing stirs pulling respectively bookcase falls on and now you just after all these pro Krasov can be normally full paint it all
  • 17:31: business and get and a normal rack so the work is suitable end or have already reached here that all the trash which I loaded in the midst garage that is not It gives oK carry out repairs car and do the other chores finally decompose on the shelves is such about to receive good shelf design or
  • 18:00: as the rack otherwise it call see all painted dries this design occurred to me not for nothing based on the problem issues that arose during repair the car the garage and well, I introduced to life on This video came to thank you all for the end attention who watched place before the end of necessarily fingers top loved who did not like See for yourself already
  • 18:31: a private matter with you was Alexander Beloshapka channel all of independent ribbon Car repair nissan maxima we will meet with you next video